---
id: OV-C1-POS-019
title: "Re-download proceeds after dependent visitation completes or cancels"
product: mobile
module: offline-visitation
type: functional
priority: P1
risk: high
status: draft
automationStatus: planned
sourceRefs:
  tsd: PK144
  tsdSection: C1
  tsdScenario: C1.11
  prd: PK144
  jira: null
automationRef: null
lifecycleStatus: active
lifecycleReason: "AI-generated draft from PK144 TSD C1.11 (unblock branch); pending QA review."
lastReviewedAt: null
reviewedBy: null
supersededBy: null
duplicateOf: null
blockedBy: null
preconditionRefs:
  - PRE-OV-logged-in-online
tags:
  - mobile
  - offline-visitation
  - download-center
  - visitation
  - pk144
  - staging
---
## Objective
Verify re-download is allowed once no dependent visitation is in progress.

## Preconditions
- See [[PRE-OV-logged-in-online]]
- And a downloaded bundle exists whose dependent visitation just completed or was cancelled

## Steps
1. When the employee attempts re-download

## Expected Result
- Then the re-download proceeds normally (overwrites the bundle and updates the timestamp)

## Source Traceability
- TSD: PK144
- Section: C1 - Bundle Lifecycle
- Scenario: C1.11 - Re-download with "Dalam Proses" guard
- Acceptance Criteria: M.9 AC3, AC4, AC8, AC10

## Evidence Required
- Screen recording of the successful re-download and updated timestamp.

## Notes / Gaps
- No gap.
