---
id: OV-C2-POS-005
title: "Fully Offline prep: review full plan at office with good connection"
product: mobile
module: offline-visitation
type: functional
priority: P2
risk: medium
status: draft
automationStatus: planned
sourceRefs:
  tsd: PK144
  tsdSection: C2
  tsdScenario: C2.4
  prd: PK144
  jira: null
automationRef: null
lifecycleStatus: active
lifecycleReason: "AI-generated draft from PK144 TSD C2.4; pending QA review."
lastReviewedAt: null
reviewedBy: null
supersededBy: null
duplicateOf: null
blockedBy: null
preconditionRefs:
  - PRE-OV-logged-in-online
tags:
  - mobile
  - offline-visitation
  - visitation
  - pk144
  - staging
---
## Objective
Verify the employee can review the full day plan at the office before going offline.

## Preconditions
- See [[PRE-OV-logged-in-online]]
- And the employee is at the office with a GOOD connection and Mode Luring OFF

## Steps
1. When the employee opens the homepage

## Expected Result
- Then the employee sees the full channel list (Non-PJP) or full journey plan (PJP) for the day

## Source Traceability
- TSD: PK144
- Section: C2 - Visitation Flow
- Scenario: C2.4 - Fully Offline (Pre-prepared): Review plan at office
- Acceptance Criteria: M.14 AC1

## Evidence Required
- Screenshot of the full plan at the office.

## Notes / Gaps
- No gap.
