---
id: OV-C2-POS-006
title: "Fully Offline prep: bulk pre-download of multiple channels/visitations"
product: mobile
module: offline-visitation
type: functional
priority: P1
risk: high
status: draft
automationStatus: planned
sourceRefs:
  tsd: PK144
  tsdSection: C2
  tsdScenario: C2.5
  prd: PK144
  jira: null
automationRef: null
lifecycleStatus: active
lifecycleReason: "AI-generated draft from PK144 TSD C2.5; pending QA review."
lastReviewedAt: null
reviewedBy: null
supersededBy: null
duplicateOf: null
blockedBy: null
preconditionRefs:
  - PRE-OV-download-center-open
tags:
  - mobile
  - offline-visitation
  - download-center
  - pk144
  - staging
---
## Objective
Verify bulk pre-download of reference data for multiple selected items succeeds with presence indicators.

## Preconditions
- See [[PRE-OV-download-center-open]]
- And the employee is at the office with a stable connection

## Steps
1. When the employee selects multiple channels/visitations
2. And confirms the download

## Expected Result
- Then the system downloads the required reference data per item
- And on success each item shows a cloud-icon timestamp

## Source Traceability
- TSD: PK144
- Section: C2 - Visitation Flow
- Scenario: C2.5 - Fully Offline: Bulk pre-download
- Acceptance Criteria: M.14 AC2

## Evidence Required
- Screen recording of bulk download with per-item cloud-icon results.

## Notes / Gaps
- Shares storage validation with C1.6 (storage tier thresholds, Concern #5, Critical).
